Flow
Introduction and installation flow
Here is the flow of how to introduce YCW to those who are interested in introducing it.
Overall introduction flow
01Survey
Raw water quality survey, installation site survey, various condition confirmation02Quotation
YCW, Local construction03Contracts
Contracts with concerned parties, license applications04Local construction
Foundation work, water intake work, drainage work (, electric lead-in work)05Installation
Main unit installation, test operation (1 week), water quality stabilization (2 to 3 weeks)06Training
Maintenance training (2 days)07Water quality check
/ Hand over
Concerning the application for Grant Assistance for Grass-Roots Human Security Projects
Most people who wish to introduce do not have their own funds. Here, as one of the public funds that can be utilized by such persons, the method of application for Grant Assistance for Grass-Roots Human Security Projects of the Ministry of Foreign Affairs of Japan and the flow from the pre-application survey to the submission of the application form, acceptance to the ceremony are shown in a diagram. For more information on Japan's Grant Assistance for Cultural Grassroots Projects, see Grant Assistance for “Grass-Roots Human Security Projects” on the page of the Ministry of Foreign Affairs' ODA. In addition, please obtain the application documents and other details from the diplomatic missions abroad in your country.
Contents of foundation work
Prior to the installation of YCW, we will ask a local contractor to arrange the following construction. If grid power is used, the local contractor will also arrange for electrical wiring work.
Installation Flow
Here are photographs of an actual flow of the installation of YCW.